What to do when someone or a neighbour builds property on my land | Land Trespassing in Bangladesh
If a neighbour or other party has built on land you own, prompt factual and legal steps are essential. This note explains practical options in England & Wales — checking title and boundary, considering adverse possession, issuing pre-action letters, and seeking injunctions or removal orders — and id

This note explains the practical and legal steps to consider in England and Wales when a third party constructs a structure on your land. The law distinguishes between civil remedies (possession, removal, damages, injunctions) and statutory regimes such as adverse possession and planning enforcement. Act promptly: delay can affect remedies.
Immediate practical steps
Before starting formal proceedings, gather and preserve evidence. Typical early actions include:
- Check your title and boundaries: obtain an up-to-date title plan and documents from HM Land Registry if your land is registered; for unregistered land, locate deeds and historic plans.
- Survey and photograph: commission a boundary survey and take dated photographs showing the encroachment and any markers or fence lines.
- Record communications: keep a written record of any discussions with the neighbouring owner and any notices served.
- Consider safety and use: if the structure creates a safety risk, notify the local authority building control or the emergency services where appropriate.
Legal remedies and considerations
Key civil remedies include:
- Possession and removal: you can bring a claim for possession of land and for removal or demolition of unauthorised works. Courts may order removal, restoration and damages.
- Injunctions: an interim injunction can prevent further works and preserve the situation while the dispute is decided; a final injunction orders long‑term relief.
- Damages: where removal is impractical or delayed, the court may award damages for loss of use or diminution in value.
- Adverse possession: prolonged, exclusive occupation can give rise to an adverse possession claim. For registered land the Land Registration Act 2002 creates a distinct application and notification procedure; for unregistered land, 12 years’ uninterrupted possession may extinguish the owner’s title under the Limitation Act 1980.
- Planning and building control: lack of planning permission or building regulations compliance is a separate regulatory matter for the local planning authority or building control; enforcement can lead to demolition or retrospective remediation but is not a substitute for civil possession claims.
Practical checklist (recommended order)
- Obtain title documents and an up-to-date plan from HM Land Registry.
- Commission a chartered surveyor to produce a boundary report and accurate measurements.
- Seek professional advice (legal and survey) and consider a pre-action letter to the occupier/owner setting out your position and asking for voluntary remedy.
- If voluntary resolution fails, consider urgent interim relief (injunction) to stop further works.
- Prepare and issue a court claim for possession, removal and/or damages, or respond to an adverse possession application if one is made to the Keeper.
- Engage with local authority planning enforcement if planning or building regulation breaches are involved.
Jurisdiction and sources
- HM Land Registry – title registers and plans; guidance on adverse possession of registered land.
- Land Registration Act 2002 (registered land adverse possession rules).
- Limitation Act 1980 (time limits in relation to unregistered land).
- Gov.uk – Planning enforcement and local planning authority guidance.
- Civil Procedure Rules (procedural rules for injunctions and possession claims).
Our London office is at Holborn Gate, 330 High Holborn, London, WC1V 7QH, England.
General information only; not legal advice and not a substitute for advice on a particular matter.
Bring the question into focus.
Contact the London office with a high-level, non-confidential outline of the issue. We can discuss the appropriate next step.